Do I need to do anything to prepare my yard prior to installation?

Before installation, choose a build site with a 3-foot clearance on all four sides and above. The site must be free from trees, shrubs, limbs, or other debris. The site also needs to be level within 6 inches. Your installer will level up to 6 inches at no additional charge. If your site is out of level by 6 inches but is under 18 inches, we offer a leveling package for an additional charge.

You’ll need to provide access to electricity within 150 feet of the unit, as well as 3-foot minimum unobstructed access for installers to carry your materials to the building site, or additional charges will apply. Keep pets inside or on a leash away from the installation area.