Skip to next element

As low as 0% APR with Affirm | Learn More

0

:

0

:

0

:

0

Scary good savings are here - Up to 50% Off

0

:

0

:

0

:

0

Back to Ideas and Inspiration

Do You Need Building Permits for Sheds?

Do You Need Building Permits for Sheds?

Getting a storage shed for your backyard is relatively easy. Even though a shed may only take up 200 to 800 cubic feet of space, many regions require a building permit for any outdoor structure that is above a certain height. While not all regions require a building permit, you need to continue reading in case your local region requires a building permit for sheds.

In most regions installing a 6×8 or 8×8 shed would meet most building code requirements. However, installing garage sized sheds (16×24 or 16×20) may challenge local zoning restrictions. It’s the homeowner’s responsibility to obtain a building permit prior to installation! Each county has different building codes so it is important for you to make sure you get accurate information. If your shed is found to be in violation of building codes after it is installed, it will have to be moved or removed which can be an unnecessary cost.

Will My Storage Shed Meet the Building Code Requirements to Obtain a Permit?

floor-joists Each counties building codes varies. Here are a few aspects you need to be aware of that may determine whether your outdoor building will meet the building requirements for your region.

Most Common Zoning Restrictions in Place in the US:

  • 1. Size: Many areas restrict large buildings. Such as 16×24 sheds and 16×20.
  • 2. Purpose: Some areas restrict the amount of levels inside a building. For example, if you decide to establish your business using your shed as a workplace, you will need to let your building inspector know.
  • 3. Electricity: Some regions place restrictions on any electrical equipment and wiring inside your shed.
  • 4. Placement: Many regions will restrict sheds to be installed in backyards only. In addition, some areas require that sheds cannot take up more than twenty percent of backyards.
  • 5. Severe Weather: Regions with frequent hurricanes and tornadoes will require all storage buildings to be anchored to the ground to withstand heavy winds and storms. In addition, regions below the  freezing point will require exact methods for building foundations.
  • 6. Attachments: Many regions may restrict whether buildings are attached to homes or garages.
  • 7. Type of Foundation: Some regions will restrict the type of foundation. Read our article on how to prepare the ground for a shed.
  • IMG_4524-200x150 8. Away from fences and other objects: Some areas will require sheds to be a specific distance from objects such as trees, fences, property lines and pools.

Local Building Inspectors can Get you Building Permits for Sheds

Shed Liquidators requires building permits for all installations. Check to make sure your building permit is up to date. Just call your county or city building codes department to get a building permit for your shed. Leave the rest to us.

Click here to visit our website.

Related posts

Shed Liquidators storage shed in the rain, showing water-shedding roof overhang, upper windows, and a sliding barn-style door.

How to Weatherproof Your Shed: Sealing, Caulking and Protecting Your Investment

Most shed leaks start somewhere other than where the water shows up. Learn the order to inspect, which joints to caulk, and when to call a pro.

Shed Liquidators financing hero image featuring three storage sheds and the message “Finance Your Shed with Shed Liquidators and Affirm.”

How to Finance Your Shed with Shed Liquidators: A Clear Guide to Affirm

Shed Liquidators financing through Affirm starts at $1,500. See how checkout works, what to compare beyond the monthly payment, and how to budget for the full project.

Light-gray Shed Liquidators Spokane backyard storage shed with open double doors, lawn equipment, and organized garden tools.

When Is the Best Time to Buy a Shed? How to Get the Best Deal This Year

Learn how to time your purchase around storage needs, site prep, permits, and three-to-six-week install lead times so your shed is ready when you need it.