Permit Service
This covers the administrative costs associated with obtaining the permit. It does not cover other expenses such as the permit itself, engineered drawings, or specific local requirements like septic or seismic regulations. The local municipality sets these additional costs and charges them at their actual rates, with no markup included.
Things to know:
- The Permit Service does not include the cost of the permit
- Cost for permit, if needed, can vary greatly by location and project scope
Engineered drawings and costs (if required)
- The Permit Service does NOT include the cost of engineered drawings (if required)
- Cost for engineered drawings is an additional $950 paid directly to Shed Liquidators after purchase